" This blog is a integrated approach towards tracking the Indian power sector
which is evolving, having a great potential with prosperous future."

ALL INDIA INSTALLED CAPACITY

ALL INDIA INSTALLED CAPACITY

Thursday, October 21, 2010

N.N. Misra NTPC's new Director for Operations

N. N.Misra (55 Years) took over as Director (Operations) NTPC in New Delhi. A graduate in Electrical Engineering from Regional Engineering College, Rourkela in the year 1977 Shri Misra completed his schooling from the Stuwart, Cuttack passing the Indian School Certificate Examination.
As a Director(Operation), he is responsible for the Operation activities of the entire NTPC Projects.

N. N. Mishra joined NTPC in 1977 as Executive Trainee (2nd Batch) in the Electrical Department of NTPC looking after the various functions of Electrical Design, Project Engineering etc.

 He also worked as Executie Director, Northern Capital Region , Executive Director(CC&M) , Executive Director(HR) and lastly as Executive Director(OS).

No comments:

Post a Comment