" This blog is a integrated approach towards tracking the Indian power sector
which is evolving, having a great potential with prosperous future."

ALL INDIA INSTALLED CAPACITY

ALL INDIA INSTALLED CAPACITY

Saturday, September 17, 2011

Thermal NTPC’s Simhadri project unit 3 is operational

National Thermal Power Corporation’s unit 3 of 500 MW of Simhadri Super Thermal Power Project is commercially operational from today (Friday). With this, the commercial capacity of Simhadri is 1500 MW and total capacity of NTPC is 30,330 MW

No comments:

Post a Comment